Search
Close this search box.

Robinson High School

Project Location: Tampa, Florida

Project Summary:

  • Temporary Fence Install – approx. 3000 LF in 2021
  • Permanent Fence Install in 2023.
  • Ameristar fence and gate products installed:
    • 6’ high Montage Plus
    • 6’ high Montage II
    • 10’ high Aegis II
    • 12’ high Aegis II
  • 15’ high black vinyl chain link athletic court fence and gates.
  • Multiple 6’ H black chain link utility, bike rack, and storage enclosures with gates.
  • (6) panic hardware equipped gates.